While they were cutting out the floor and building the new staircase we taped up some black plastic tarps to block off the construction zone openings from the rest of the house. When they had to demolish our old concrete bathroom floor the entire house got covered in concrete dust. This time we didn’t want [...]
Entries from September 2008
Taping off the Construction Zone
September 21st, 2008 · 2 Comments
Tags: Planning
Removing our old Staircase
September 20th, 2008 · 1 Comment
Since the new internal stairs are finally almost ready for us to use we have removed our old rear external staircase. The old rear staircase actually consisted of half of the old (per-house lift) front stairs welded to the original rear stairs. The railing was a single 2 x 4 attached to the house at [...]
Tags: House Lifting
Internal Staircase Construction Complete
September 15th, 2008 · 2 Comments
The stairs are finished and we are able to start painting. They have turned our really well. The dark Kwila timber stair treads actually manage to flow quite well with the pine floorboards up the top. I was actually quite surprised that they turned out almost the same colour as the Western Red Cedar louvers [...]
Tags: House Lifting
Day 3 and 4 of our Internal Stairway Installation
September 12th, 2008 · No Comments
On the third day of our stairway construction the landing was put on in the middle of the staircase and the plasterer started on the plastering. Because the area that we are putting the staircase isn’t very big I was tempted to put in winders instead of a landing. The landing takes up about the [...]
Tags: House Lifting