I drove past the house today and was absolutely shocked by how high it was! At first I thought that it was only that high to accomodate installing the new stumps into the ground, but after talking to Gary it seems that it will only be coming down a couple of centimetres to sit on the posts. He’s assured me that it won’t look as high after he has poured the slab and then we have enclosed it, but right now it looks pretty high…

Right Side of House after lifting - Raise and Restump
Right side the now lifted house
Front of House after lifting - Raise and Restump
Front of the lifted house
Left Side of House after lifting - Raise and Restump
Right of the lifted house

I got in the house today to have a look and it was swaying with the wind, which was a bit disconcerting. It actually made me feel a bit sea sick while I was up there, even though it was only swaying a few centimetres. I was told that should settle down after it’s been lowered onto the stumps and the cross bracing is put in.

Previous Posts in the House Lifting Series:

2 Replies to “Day 7 of the House Lift – Crikey That’s High!”

  1. Pingback: Renovate Australia » Day 8 of the House Lift - Massive Footings

  2. Pingback: Renovate Australia » House Lift is Complete

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.